50-100 individuals working at energy venture lacking; 2 our bodies recovered: Uttarakhand DGP

0
8


An estimated 50-100 personnel working at a power project in Tapovan-Reni space of Uttarakhand are lacking following which search and rescue operations have been launched, Uttarakhand DGP Ashok Kumar mentioned on Sunday after a glacier broke resulting in a flash flood in Chamoli district. Kumar informed PTI that at the least two our bodies have been recovered, whereas some injured have been rescued after state catastrophe response forces reached the affected areas. He mentioned the ability venture at Tapovan-Reni has been swept away utterly. “The scenario is below management now. There’s a dam at Srinagar and it has contained the circulation. The ability venture has taken harm.”

“Our preliminary estimate is that 50-100 individuals who had been working in and across the energy venture are lacking,” the state police chief mentioned. The groups had reached the spot in a short time from Joshimath (about 20 minutes distance) and so they rescued some injured whereas two our bodies had been additionally discovered, he mentioned. “We can provide you with a transparent image by the night,” Kumar mentioned.





Source link

HostGator Web Hosting

LEAVE A REPLY

Please enter your comment!
Please enter your name here